Power systems consultancy for studies that don't fit a template.
Velon supports TSOs, DNOs, developers, OEMs and manufacturers across the full project lifecycle — PSCAD consultancy, EMT and PowerFactory studies, feasibility, grid-connection design, grid-code compliance and post-fault root-cause analysis — for converter-dominated networks, BESS, HVDC, data centres and large loads in the UK and internationally.
The studies we specialise in.
Select a practice to see the engineering question it answers and the result we deliver. Toggle each figure to compare the as-found case against the validated fix.
Where phasor tools stop being trustworthy.
Electromagnetic-transient studies and PSCAD models for converter-dominated networks — IBR interaction, BESS, HVDC and Power-to-X, where control dynamics decide the result.
Evidence packages that pass first time.
Clause-by-clause compliance and submission-ready evidence packs — FRT, voltage and frequency response, reactive capability and model acceptance — built for TSO and network-operator review.
Where a capable plant meets a weak grid.
Weak-grid integration, sub-synchronous oscillation and control-interaction studies — impedance-based screening for resonance and stability risk at low short-circuit ratio, before they show up on site.
The model is what the TSO actually checks.
Model quality testing, generator and IBR model validation, and RMS-to-EMT consistency — the evidence a connection needs before a TSO will accept the study, with field validation where measurements exist.
When the load is big enough to move the grid.
Connection and integration studies for data centres, electrolysers and large industrial loads — power quality, harmonic risk, energisation, weak-grid connection and interaction with nearby IBR or HVDC assets.
From first feasibility to post-fault.
Most connection projects need the same studies at different stages. Velon supports the whole arc — early option-screening, the detailed studies that win a connection offer, compliance sign-off, and root-cause analysis when something trips after energisation.
Feasibility & optioneering
Pre-feasibility and feasibility studies that test the technical concept, screen connection points and set the functional requirements — the basis for well-founded strategic decisions on large infrastructure.
FEED & front-end studies
Front-end engineering design — firming up the connection concept, sizing primary plant and reactive support, and running the studies that de-risk the basis of design before detailed work begins.
Connection design & studies
The full study programme — load flow, fault level, RMS, EMT, harmonics, protection — building the validated models that secure the grid-connection offer.
Grid-code compliance
National connection requirements reviewed and anticipated; compliance studies delivered, with the system-operator discussion supported through to sign-off.
Post-fault & in-service
Transient fault records evaluated and a numerical root-cause analysis carried out — plus proactive studies to drive down the risk of future trips.
Every study a connection actually needs.
Beyond the classic study set, Velon focuses on the hard modern problems — complex inverter behaviour, data-centre and large-load interaction, and large-scale wide-area EMT — and on automating these studies so they stay repeatable and auditable. Pick any study to see what it covers; the list is representative of our scope, not its limits.
International power-system support
For key international markets, our engineers identify the applicable connection requirements and anticipate likely future developments — so a project conceived in one jurisdiction is studied against the right code from the start. Velon works across GB, European (ENTSO-E) and Gulf-region requirements.
Built for the hard problems.
Selected power-system work.
Real engagements — fleet-wide modelling, generator re-compliance, battery SSO screening and an EMT enabling tool we built ourselves.
Power-system modelling partner to ET Fuels
Velon is the power-system studies partner across the entire fleet of the ET Fuels e-methanol programme — EMT modelling, grid integration and connection support, plant by plant.
View the engagement →Generator EMT model · field-validated
A full synchronous-generator EMT model — machine, excitation, stabiliser and protection — built in PSCAD and validated against field measurements for grid-code compliance.
View the case study →~40 MW BESS · SSO screening
Sub-synchronous oscillation screening for a grid-scale battery — PSCAD/EMTDC injection tests and MIMO impedance scans, cross-checked against the Nyquist critical-point criterion.
View the case study →Network reduction for EMT studies
Our Python + DPL network-reduction toolkit collapses a full transmission model to a lean, boundary-aware EMT study model — validated to under 1% at the boundaries.
Explore the toolkit →When the study repeats, we turn it into a workflow.
Many teams lose time to repeated case setup, spreadsheet result-checking, manual plot extraction and disconnected model versions. Velon can convert repeatable study logic into Python automation, dashboards, model-QA tools and AI-assisted review — with engineers in control of final judgement.
- ○Repeated data entry
- ○Disconnected files & versions
- ○Manual case setup
- ○Slow result review
- ○Spreadsheet-driven evidence
- ○Version uncertainty
- ✓Batch scenario generation
- ✓Automated result extraction
- ✓Model QA & validation checks
- ✓Evidence-pack assembly
- ✓Traceable decision log
- ✓Engineer review checkpoint
Each study, in detail.
Dedicated pages for the studies we are asked for most often.
Questions engineers ask us.
What are EMT control-interaction studies, and when are they needed?
How do you screen for subsynchronous resonance (SSR) and converter-driven oscillations?
When should a project move from RMS to EMT modelling?
How do you coordinate with TSOs and DNOs during a study?
What does a typical study deliver?
Send the study scope. We'll send a response.
One paragraph is enough to start. We typically come back within two working days.