Lose 1,800 MW
Fails- Lowest frequency need ≥ 49.2 Hz
- – Hz
- Initial RoCoF
- – Hz/s
- Inertia added
- – GVA·s
An evidence base, a working model and a procurement-ready scorecard. Together they turn distributed plant below 132 kV into a qualified source of system strength and inertia for the transmission operator.
Illustrative case. It shows what a workflow can do; it is not a client project.
System strength and inertia are bought almost entirely from synchronous plant on the transmission network. Below 132 kV, tens of gigawatts of distributed plant could provide these services but has never been qualified to.
~30 GW in scope for stability services today
Illustrative split of stability-capable capacity. Each square is 0.25 GW.
Pick a technology to see what one unit can offer across five services. The dashed outline is a synchronous condenser, the usual benchmark.
Ramps active power in milliseconds, so it is the strongest fast-frequency and damping resource. Synthetic inertia and system strength depend on grid-forming control.
A low-inertia day. Choose which plant below 132 kV to enrol, then watch two events play out. Try to pass both with as little capacity as you can.
Which distributed plant can provide system strength, inertia and damping, technology by technology.
Performance proven at the connection point through RMS and EMT studies.
Qualified potential turned into a service the operator can actually buy.
Tens of gigawatts below 132 kV, made visible and dispatchable.
For the operatorA bespoke study and toolset built around a real operator question. Bring us yours, and we will build the analysis and the tool around it.